propose landfill recycling for the city



Only a sanitary landfill for high-density that includes a 20% recycling of waste, appears as indicated and viable solution, technically and economically, for Antofagasta.


This follows from the title work done by the civil engineer of the UCN, Juan Munizaga Plaza, who conducted an exhaustive study of the measures to be taken at kilometer 12 (High Portezuelo) as the current landfill will an April 2009 closed.


Munizaga is clear in saying that the future method of disposal of solid household waste should consider factors such as environmental protection, technology application, minimize disposal volume and is an effective alternative in arid, ie a high density landfill.


INVESTMENT


A project of this nature is estimated to cost U.S. $ 5,231,257, although in two stages. While the figure may seem extremely high, Munizaga, says it is feasible and dividends INVESTMENT also implies that some stakeholders to execute such projects.


Her thesis analyzed the available statistics for the period 1997-2006, determining a per capita generation rate of 1.05 kg / person-day, much like the flag of the metropolitan area of \u200b\u200b1, 10 kg / person-day.


addition, the characterization of solid household waste is available in Antofagasta indicates a 32.97% organic matter, waste paper and Cato are 20.18% and 12% plastic, according to information 1995.


also explained that due to problems management and disposal which currently owns the city, it is very urgent that the city administration made in the field studies completed since the available data do not consider changes in consumption habits in the last 12 years.


The pre basic engineering applied to landfill considers projections of the volumes of household waste and similar, low high-density compaction with a 20% recycling of organic and inorganic fraction.


The study shows that the model presented by Munizaga gives longer life to the sector mile 12, which called High Portezuelo thesis, a project horizon of 28 years, while that without proper intervention will be only 16 years.